Immediate loading in the maxilla with the aid of guided surgery

Dr. Beni Oz Ari | Philip Segal MDT

Immediate loading in the maxilla with the aid of guided surgery

1

Extraction of teeth:  15, 14, 13, 24, 25, 26

2

Immediate placement of  implants 15,13, 24,25

3

Immediate temporary bridge:  16 – 25

4

Avoiding sinus elevation

Extraction of teeth: 15, 14, 13, 24, 25, 26,

EXTRACTION OF TEETH: 15, 14, 13, 24, 25, 26,​

Synchronization of model scan to dicom

The use of tilted implants to avoid sinus elevation

Implant planning

Distal tilted implants 15 & 25 offer prosthetic solution without sinus elevation

Angled abutments offer prosthetic solution

CAD/CAM preparation of temporary bridge

3D model design

Preparation of models, abutments, temporary copings and temporary bridge prior to surgery

Preparation temporary bridge prior to surgery

Preparation of angulated abutments for cement retained solution

Preparation of temporary PMMA copings on abutments

Surgical guide

Temporary bridge

Seating of surgical guide

Prior to Surgery

Extraction of distal teeth

Surgical Phase

Surgical Phase

Removal of anterior bridge – extraction of tooth 12

Connection of abutments and seating of PMMA copings on abutments

Seating of immediate temporary bridge